[Oct-2026] Oracle 1z0-1075-25 Exam Practice Test Questions – BraindumpsPass [Q10-Q28]

Rate this post

[Oct-2026] Oracle 1z0-1075-25 Exam Practice Test Questions – BraindumpsPass

Updated Certification Exam 1z0-1075-25 Dumps – Practice Test Questions

Oracle 1z0-1075-25 Exam Syllabus Topics:

Section Weight Objectives
Implementing Manufacturing Setups 25% – Core configuration

  • 1. Work Centers and Resources configuration
  • 2. Manufacturing Plant setup
  • 3. Work Definitions creation and management

– Manufacturing fundamentals

  • 1. Project-Specific Manufacturing process
  • 2. Key features of Oracle Manufacturing
Advanced Features and Capabilities 10% – Automation and Intelligence

  • 1. AI/ML and Mobile features
  • 2. Redwood user experience and configuration
Implementing Applications that Enable Manufacturing 20% – Related Supply Chain Applications

  • 1. Role and integration with Manufacturing

– Configuration of supporting modules

  • 1. Quality Management setup
  • 2. Maintenance and Talent Management integration
Implementing Common Supply Chain Capabilities 20% – Overview of Oracle Supply Chain Management

  • 1. Key features and capabilities
  • 2. Fundamentals of Inventory Management
  • 3. Item Structure concepts

– Configuration of Supply Chain

  • 1. Data access and security management
  • 2. Functional Setup Manager usage
  • 3. Common objects configuration
Executing Production with Manufacturing 25% – Production execution

  • 1. Resource and material tracking
  • 2. Shop floor transaction processing

– Work Order management

  • 1. Material availability checking
  • 2. Work Order creation and lifecycle

 

Q10. To help ensure compliance with the US Code of Federal Regulations (21 CFR Part 11), your client wants to enable audit trail for manufacturing work definitions and standard operations.
Which is NOT included in the audit trail for standard operations such as creation, update, and deletion?

 
 
 
 
 

Q11. Which statement is NOT true about the Reservations tab?

 
 
 
 
 

Q12. A manufacturing plant works in two shifts of eight hours each. A Manufacturing user wants four units of a work center resource, R1, to be available during nonworking time, outside the regular shift on a particular day.
Which is the correct sequence of steps to create a resource exception on the Manage Work Center Resource Calendar page?

 
 
 
 

Q13. In a manufacturing plant, two purchase components, PI and P2, and a resource, Rl, are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates for the assembly have been defined as Required.
A Cost Accountant is estimating cost of the assembly, and analyzing rolled-up costs before finally publishing estimates as frozen standards to Cost Accounting by using a Cost Planning Scenario. While reviewing rolled- up costs, the extended costs of purchase components are not included in a rolled-up scenario.
What is the reason for this?

 
 
 
 

Q14. Your customer runs two daily shifts in their plant: morning shift and evening shift. A resource, LATHE, is assigned to the work center W1. There are five units of LATHE available, of which three units are available for the morning shift and the remaining units for the evening shift.
Which two actions must the customer perform to associate LATHE with W1?

 
 
 
 
 
 

Q15. Which three entities must you set up in Oracle Manufacturing Cloud to create a work definition for an item that will be manufactured in-house?

 
 
 
 
 

Q16. In which two places can you create and edit user-defined work order statuses?

 
 
 
 

Q17. A Plant Manager bought several machines for their ABC manufacturing plant. The plant is set up with a separate cost element set, ABC, in Manufacturing Cloud.
How must the Plant Manager configure these machines so that they are costed to the work order for which operations are performed on them?

 
 
 
 

Q18. Which three types of item quantities are displayed on the Work Order History tab?

 
 
 
 
 

Q19. The pick release of a project work order creates movement requests with the project and the task from the work order.
Which statement is NOT true about this?

 
 
 
 

Q20. An employee is responsible for dealing with different manufacturing practices and processes, machines, tools, and equipment that turn raw material into a product.
Which seeded job role must you assign to this employee?

 
 
 
 
 

Q21. In the work execution area, which three infolets are provided to users for instant access?

 
 
 
 
 

Q22. Your customer runs production 24 x 7 x 365 and wants to track Overall Equipment Effectiveness (OEE) online.
Which key setup can they use to achieve this?

 
 
 
 
 

Q23. Production operations need operators to execute the right steps to produce quality products, so want to use ” View Document Items on a Dispatch List. ” Which statement is NOT true?

 
 
 
 

Q24. Your customer needs to add additional information to their work order traveler. Which statement is NOT true about the Extensible Work Order Traveler?

 
 
 
 
 

Q25. Which statement is NOT true about cumulative lead time?

 
 
 
 

Q26. Which is NOT a required setup task for Manufacturing master data?

 
 
 
 
 

Q27. Which statement is NOT true about user-defined work order statuses?

 
 
 
 

Q28. Which two reports provide work order cost-related information to Costing users?

 
 
 
 

Updated Verified 1z0-1075-25 dumps Q&As – Pass Guarantee or Full Refund: https://www.braindumpspass.com/Oracle/1z0-1075-25-practice-exam-dumps.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

More Posts

Recent Comments
    Categories

    Post: [Oct-2026] Oracle 1z0-1075-25 Exam Practice Test Questions – BraindumpsPass [Q10-Q28]

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    Enter the text from the image below