[2023] C-TS422-2020 Answers C-TS422-2020 Free Demo Are Based On The Real Exam [Q55-Q73]

4/5 - (1 vote)

[2023] C-TS422-2020 Answers C-TS422-2020 Free Demo Are Based On The Real Exam

C-TS422-2020 [Oct-2023 Newly Released] Exam Questions For You To Pass

NO.55 What is a typical transportation processing SAP Transportation Management?

 
 
 
 

NO.56 Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

 
 
 
 
 

NO.57 If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?

 
 
 
 

NO.58 The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?

 
 
 
 

NO.59 Which data model changes have been implemented in Sales and Distribution? There are 3 correct answers to this question.

 
 
 
 
 

NO.60 Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

 
 
 
 

NO.61 You are transferring data from SAP S/4HANAIo embedded PP/OS. What master data objects are mapped to a location? There are 3 correct answers to this question.

 
 
 
 

NO.62 What must be used in the system to plan the requirements for different subcontractors separately?

 
 
 
 

NO.63 Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

 
 
 
 

NO.64 Which task list types can have parallel sequences? There are 2 correct answers to this question.

 
 
 
 

NO.65 In which data object is the production line (Repetitive manufacturing relevant work center) maintained?

 
 
 
 

NO.66 What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question.

 
 
 
 

NO.67 A material has been set up as a phantomassembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?

 
 
 
 

NO.68 What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question.

 
 
 
 
 

NO.69 What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.

 
 
 
 

NO.70 At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be generated?

 
 
 
 

NO.71 What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

 
 
 
 

NO.72 For which planning-relevant data objects do you set just one indicator to include then in PP/DS?
There are 2 correct answers to this question.

 
 
 
 

NO.73 Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers tothis question.

 
 
 
 

New 2023 Realistic Free SAP C-TS422-2020 Exam Dump Questions and Answer: https://www.braindumpspass.com/SAP/C-TS422-2020-practice-exam-dumps.html

More Posts

Recent Comments
    Categories

    Post: [2023] C-TS422-2020 Answers C-TS422-2020 Free Demo Are Based On The Real Exam [Q55-Q73]

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    Enter the text from the image below