Buy Latest Jan 17, 2023 NACE-CIP2-001 Exam Q&A PDF – One Year Free Update [Q32-Q50]

4/5 - (1 vote)

Buy Latest Jan 17, 2023 NACE-CIP2-001 Exam Q&A PDF – One Year Free Update

Download the Latest NACE-CIP2-001 Dump – 2023 NACE-CIP2-001 Exam Questions

Q32. Generally for safety considerations, waterjetting hose connections use

 
 
 
 

Q33. NACE/SSPC Water Jetting standards are directly equivalent to ISO Abrasive Blast Standards:

 
 

Q34. NACE Level 2 Inspectors have been authorized to perform:

 
 
 
 

Q35. You are the NACE Inspector on a project where a stationary floating structure is being coated and you notice a self-smoothing anti-fouling coating has been specified.
This is not a good choice because:

 
 
 
 

Q36. Eddy current DFT gauges are used to measure Dry Film Thickness in which of the following situations:

 
 
 
 

Q37. You are the NACE Level 2 Inspector on a project where overcoating of galvanized steel is being performed. The specification references SSPC SP 16 as the surface preparation method. At the pre-job meeting operations personnel make it clear that abrasive blasting will not permitted. The Owner’s representative asks you what other methods might be used.
Of the options shown below, what would be the preferred option in this situation?

 
 
 
 

Q38. Individuals conducting Coating Surveys should:

 
 
 
 

Q39. Cold-applied tape

 
 
 
 

Q40. Inspector reports should always be copied to:

 
 
 
 

Q41. NACE No.13/ SSPC 6 identifies the use of:

 
 
 
 

Q42. You are the NACE Coating Inspector on a tank lining project and are asked to perform a high voltage holiday test after the coating applicators have completed their final repairs. After meeting all the confined space entry permit you enter the tank and notice a very strong odor of solvent.
Your first course of action should to:

 
 
 
 

Q43. The best choice of instrument for holiday testing of thick film concrete coatings is:

 
 
 
 

Q44. On pipelines, which coating is identifiable by its distinct colors, usually light blue, green, or grey?

 
 
 
 

Q45. The cost of qualified Coating Inspection is normally offset by:

 
 
 
 

Q46. When observing fabrication defects the NACE Inspector should:

 
 
 
 

Q47. The Inspectors’ goal at the Pre-Job Conference is to:

 
 
 
 

Q48. Steel shot grit contaminated with oil or grease used in a cetrifugal blast cleaning should be

 
 
 
 

Q49. You are a NACE Level 2 in-house inspector working in a shop. Your in-house requires you to perform a sleeve test to test for soluble salts; however the 3 rd party NACE Level 3 inspector, the owner, has a san smart meter and has achieved a very different result and has rejected the pre-cleaning.
Your FIRST course of action is to:

 
 
 
 

Q50. Antifouling coatings are regulated by international treaties.

 
 

Verified NACE-CIP2-001 Dumps Q&As – 1 Year Free & Quickly Updates: https://www.braindumpspass.com/NACE/NACE-CIP2-001-practice-exam-dumps.html

More Posts

Recent Comments
    Categories

    Post: Buy Latest Jan 17, 2023 NACE-CIP2-001 Exam Q&A PDF – One Year Free Update [Q32-Q50]

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    Enter the text from the image below