NO.22 For production orders, cost object controlling (COC) can be carried out on an order-related or product-related basis. Which of the following do you have to consider? Note: There are 2 correct answers to this question.

 
 
 
 

NO.23 You are trying to create a production order, but NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.

 
 
 
 

NO.24 You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile?

 
 
 
 

NO.25 How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

 
 
 
 

NO.26 You want to create a production order. What methods can you use?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.27 Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.

 
 
 
 

NO.28 What does the material type influence? Note: There are 2 correct answers to this question.

 
 
 
 

NO.29 Which of the following elements does MRP take into account during net requirement calculation? Note:
There are 2 correct answers to this question.

 
 
 
 

NO.30 When you create a sales order
When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly?

 
 
 
 

NO.31 What could be the reason for different combinations of components in a multiple bill of material (BOM)?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.32 Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.

 
 
 
 

NO.33 How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,

 
 
 
 

NO.34 How are dependent requirements for assemblies created?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.35 What are the advantages of collective orders? Note: There are 2 correct answers to this question.

 
 
 
 

NO.36 How can you support a GMP (Good Manufacturing Practice) compliant production process? Note: There are
3 correct answers to this question.

 
 
 
 
 

NO.37 You need to model goods receipt processing time in detailed scheduling. Which modeling options do you have?
Note: There are 3 correct answers to this question.

 
 
 
 
 

NO.38 where does the system check master data selection settings during the creation of planned orders and production orders?
Note: There are 3 Correct answers to this question.

 
 
 
 
 

NO.39 During production order creation several valid production versions are found. How does the system choose the production version?

 
 
 
 

NO.40 You are trying to create a production order NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.

 
 
 
 

Latest C_TS422_2023 Study Guides 2025 – With Test Engine PDF: https://www.braindumpspass.com/SAP/C_TS422_2023-practice-exam-dumps.html

Related Links: www.stes.tyc.edu.tw www.stes.tyc.edu.tw freestyler.ws www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.flirtic.com

More Posts

Recent Comments
    Categories

    Post: [Q22-Q40] BraindumpsPass C_TS422_2023 Real Exam Question Answers Updated [Dec 07, 2025]

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    Enter the text from the image below